Service Background
Service

Floor Levelling.

Achieve a glass-smooth, structural finish for your new floor coverings.

The Art of Flatness.

Modern flooring like LVT (Luxury Vinyl Tiles) requires a subfloor variance of no more than 3mm over 3 meters. A standard concrete slab rarely meets this spec.

Our flood levelling service corrects undulations, ensuring your new floor sits flat, feels solid, and looks impeccable under any lighting condition.

🌊

Liquid Flatness

Self-levelling compound flows to create a perfectly flat surface, correcting waves and dips.

💪

High Strength

We use high-MPA compounds that are hard, durable, and resistant to point loading.

📏

Precision

Can be applied from feather-edge (1mm) up to 50mm+ in a single bulk fill.

🚀

Rapid Setting

Walkable in 2-4 hours and ready for floor covering in as little as 12-24 hours.

Critical For

Vinyl Planks
Essential for 3mm tolerance
Engineered Timber
Prevents board deflection
Hybrid Flooring
Stops joint breakage
Carpet Tiles
Commercial Standard
Large Format Tiles
Prevents lippage
Direct Stick
Uniform adhesion

The Pour Process

1

Prime & Seal

The substrate is essentially sealed with a specialised primer to ensure bond and prevent air bubbles.

2

Mix & Pour

We mix the compound to exact water ratios and pour it across the floor.

3

Spreading & Smoothing

Using gauge rakes and smoothing trowels, we guide the flow of the material.

4

De-aeration

A spike roller is used to release trapped air and ensure a glass-smooth finish.

Premium Compounds

We select the right compound for the depth and application required.

Ardex K-12Ardex K-55 (Rapid)Kiesel ServoplanBulk Fill CompoundsFeather Finish

Levelling Projects

See the quality of our preparation and finishing work. Real projects, real results.

Clean Uplift & Removal

Clean Uplift & Removal

Filling Low Spots for Perfect Install

Filling Low Spots for Perfect Install

Absolute Perfect Flood Levelling

Absolute Perfect Flood Levelling

ACTION REQUIRED: Description Needed

ACTION REQUIRED: Description Needed

Common Questions

Most concrete slabs are not flat enough for modern flooring types like vinyl plank or hybrid. Levelling prevents the new floor from showing lumps, bumps, or bouncing underfoot.
Typically, you can walk on the levelled floor after 2-4 hours, depending on humidity and temperature.
Yes, provided the tiles are sound and secure. We grind the glaze, prime them, and flood coat over the top.
It is a premium process, but it is cheaper than ripping up a new floor that has failed due to poor prep. We charge per bag/m² so you only pay for what you need.
We use trusted trade brands like Ardex, Kiesel, and Mapei to ensure manufacturer warranties are maintained.

Level Up Your Floor.

Don't let a bumpy slab ruin your renovation. Get a perfectly flat base today.