
Sept 2026
Uneven Spring Hill slab prepared with a flood coat
Recent Spring Hill floor preparation job where the slab was very uneven. The worst high spots were ground down first, then an engineered self-levelling compound was flood coated across the floor to create the right base for a flat flooring installation.
- Concrete grinding
- Engineered self-levelling
- Flood coat preparation






